Design of reinforcement concrete flat slab bridge im U. Vidanes Street Quisao, Pililla, Rizal (Record no. 419)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01966nam a22002297a 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | URS |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20220117113528.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 170610b xxu||||| |||| 00| 0 eng d |
040 ## - | |
-- | URS |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
050 00 - LIBRARY OF CONGRESS CALL NUMBER | |
Classification number | NA 105 |
Item number | .D46 2016 |
245 ## - TITLE STATEMENT | |
Title | <a href="Design of reinforcement concrete flat slab bridge im U. Vidanes Street Quisao, Pililla, Rizal">Design of reinforcement concrete flat slab bridge im U. Vidanes Street Quisao, Pililla, Rizal</a> |
Statement of responsibility, etc | Melvin P. Buhay...[et.al]. |
264 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2016 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 87 leaves : |
Other physical details | illustrations ; |
Dimensions | 28 cm. |
502 ## - DISSERTATION NOTE | |
Degree type | Thesis (Bachelor of Science in Civil Engineering) -- University of Rizal System-Morong. |
520 ## - SUMMARY, ETC. | |
Summary, etc | EXECUTIVE SUMMARY: The goal of the thesis is to proposed a Reinforced Concrete Design of Bridge in U. Vidanes Street Quisao, Pililla, Rizal. By performing survey and investigation of how the bridge will be more functional not only to the people around it but also to the province of Rizal. The researchers center their study in designing of Reinforced Concrete Design of Bridge and conducted surveys in the case study area. According to the locals, the existing bridge is said to be floode when there is a heavy rain or storm. So the researchers think of a way of how the bridge will cope during the situation. Most of the errors in planning the design are determined earlier that result an immediately changes of plan to make a new better design of Reinforced concrete bridge. For the Reinforced concrete bridge, the researchers properly arranged the position of the abutment, the location of reinforcements, and the railings to secure the safety of the passengers. The researchers also computed and estimated for the design of the structure of the Reinforced Concrete Bridge. The length of the bridge is 17 meters having two abutments both sides. The total cost of the project is approximately P2.6M. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name as entry element | Architecture -- Planning. |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Camilan, Angeline C. |
Relator term | author |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Lopez, Patricia Elaine A. |
Relator term | author |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | Matawaran, Zyrus T. |
Relator term | author |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Library of Congress Classification |
Koha item type | Theses and dissertations |
Withdrawn status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Home library | Current library | Shelving location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Library of Congress Classification | Reference | Morong College Library | Morong College Library | On Display | 06/10/2017 | NA 105 .D46 2016 | URSMOR-CL-004669 | 06/10/2017 | 1 | 02/27/2019 | Theses and dissertations |