Image from Google Jackets
Image from OpenLibrary

EXTRA RICE'S HOG FINISHING PROJECT/ Neil Patrick M. Buenaflor; [et...al]

By: Contributor(s): Material type: TextTextPublication details: 2016Description: viii, 95 leaves illustrations, 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s):
LOC classification:
  • LG 221.R59 Ex87 2016
Dissertation note: Project Development Report Bachelor in Agricultural Technology University of Rizal System, Rodriguez, Rizal 2016 Summary: The Project Development Report was entitled Extra Rice'sHog Finishing Project. The project title came from the group name of the proponents. The project was managed by Nimuel Verano, Micko Dela Cruz, Neil Patrick Buenaffor and Jolar Dalisay who were financed by their parents. The project started on August 17, 2015 and was terminated on December 28, 2015. The project was first conducted at Brgy. Geronimo Rodriguez, Rizal but due to incidence of pests that affect the stocks, the proponents transferred the stocks to another site. It was now transfered at Carlton Village Brgy. Manggahan Rodriguez, Rizal because there were existing pig pen, availability of water supply, safe from intruders and two of the proponents were related to the owner of the pig pen. The materials used by the proponents to construct the pen were cement, hollow blocks, PVC, sieved sand, used galvanized iron and tie wires. The total cost of construction materials used by the proponents were two thousand two hundred sixty pesos (P 2,260.00). The proponents disinfected the pig pen before the arrival of stocks to eliminate the harmful microorganisms present in the pig pen that can cause infection or disease in the stocks. The proponents used chlorine as disinfectant, five (5) sachet of chlorine to a pail of water. The solution was sprayed in different parts of the pig pen. The proponents disinfected the pig pen once a week and
Tags from this library: No tags from this library for this title.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Theses and dissertations Theses and dissertations Rodriguez College Library Undergraduate Theses LG 221.R59 Ex87 2016 (Browse shelf(Opens below)) 1 Not For Loan URSROD-PDR-BAT-0313

Project Development Report
Bachelor in Agricultural Technology
University of Rizal System, Rodriguez, Rizal
2016

The Project Development Report was entitled Extra Rice'sHog Finishing Project. The project title came from the group name of the proponents. The project was managed by Nimuel Verano, Micko Dela Cruz, Neil Patrick Buenaffor and Jolar Dalisay who were financed by their parents. The project started on August 17, 2015 and was terminated on December 28, 2015.

The project was first conducted at Brgy. Geronimo Rodriguez, Rizal but due to incidence of pests that affect the stocks, the proponents transferred the stocks to another site. It was now transfered at Carlton Village Brgy. Manggahan Rodriguez, Rizal because there were existing pig pen, availability of water supply, safe from intruders and two of the proponents were related to the owner of the pig pen.

The materials used by the proponents to construct the pen were cement, hollow blocks, PVC, sieved sand, used galvanized iron and tie wires. The total cost of construction materials used by the proponents were two thousand two hundred sixty pesos (P 2,260.00).

The proponents disinfected the pig pen before the arrival of stocks to eliminate the harmful microorganisms present in the pig pen that can cause infection or disease in the stocks. The proponents used chlorine as disinfectant, five (5) sachet of chlorine to a pail of water. The solution was sprayed in different parts of the pig pen. The proponents disinfected the pig pen once a week and

There are no comments on this title.

to post a comment.

University of Rizal System
Email us at univlibservices@urs.edu.ph

Visit our Website www.urs.edu.ph/library

Powered by Koha